- Home
- How it works
How a project runs, from brief to delivery.
Every Bridgehorse project follows the same nine stages and is recorded in one 24-clause schedule. The schedule is the contract of detail between you, us and the factory. The portal shows where your order is against it.
- Stages
- 9
- Schedule clauses
- 24 in 6 sections
- Languages
- English · 中文
- Our time zone
- UTC+8
The nine stages.
Stages 1 and 2 are free. Our fixed fee is paid in three parts: when sourcing starts at stage 3, when you place the order at stage 6, and after the goods pass inspection at stage 7.
- 01 Brief received需求提交
- You create an account and submit the product, quantity, target price, delivery terms and any drawings or photos. The brief fills the first clauses of your schedule automatically.
- 02 Schedule aligned确认书对齐
- We go through the schedule with you on a video call, mark what is confirmed, and agree on the service phases you want.
§1.1–1.5§3.1–3.2§6.1 - 03 Factories verified寻源核验
- Starts when you pay the sourcing deposit, part 1 of our fixed fee. We search for manufacturers, check each one in China's official SAMR business registry, and send you a quote comparison from 3 verified factories.
§6.1§6.2 - 04 Audit & samples验厂打样
- We visit shortlisted factories, record the production line and samples in photos and video, and coordinate sampling. You can join the audit by video.
§4.1§4.3§6.3 - 05 Golden sample sign-off封样确认
- You approve the golden sample. Product specs in Section II are confirmed against it, and it becomes the reference for production and inspection.
§2.1–2.6§4.3 - 06 Deposit & production定金排产
- You pay the deposit to the factory by T/T and production starts on the agreed lead time. Part 2 of our fixed fee is due when you place the order. We post progress to your order.
§3.3§6.2 - 07 Inspection & loading验货装柜
- Pre-shipment inspection at the factory to the AQL in your schedule, then container loading supervision. Failed lots follow the rework rule you chose. The last part of our fee is due only once the goods pass.
§5.1 - 08 Shipped已出运
- Goods leave port. Shipping documents and the bill of lading are released on the terms in your schedule.
§5.2 - 09 Delivered已交付
- Goods arrive. Any transit breakage claim follows the allowance and claim window you agreed.
§5.3
The schedule, clause by clause.
Each clause says who fills it in. All 24 are mandatory before production starts. Every clause also has an "other" line for anything the options do not cover.
| No. | Clause | Filled in by |
|---|---|---|
| 1.1 | Buyer entity & primary contact买方公司与项目负责人 | You |
| 1.2 | Export compliance & lab testing standards出口准入与实验室理化检测标准 | Both |
| 1.3 | Delivery & customs clearance terms交货与清关方式 | Both |
| 1.4 | Billing currency & quotation validity结算币种与报价有效期 | Bridgehorse |
| 1.5 | Confidentiality & intellectual property保密机制与知识产权 | Both |
| 2.1 | Material grade & thermal performance主体材质与耐温性能 | Both |
| 2.2 | Dimensions, wall thickness & unit weight几何尺寸、壁厚与单套净重 | Both |
| 2.3 | Engineering drawings & reference sample工程图纸与实物参考样 | You |
| 2.4 | Surface, functional details & branding外观色泽、功能结构与品牌 Logo | You |
| 2.5 | Unit packaging & drop protection单套包装结构与防摔标准 | You |
| 2.6 | Pallet specification & container loading托盘检疫规格与整柜配载 | Both |
| 3.1 | Order quantity & production MOQ采购数量与产线起订量 | Both |
| 3.2 | Target unit price & included scope目标单价与单价包含范围 | Both |
| 3.3 | Production lead time & shipment batch生产周期与交付批次 | Both |
| 4.1 | Tooling strategy & development schedule模具开发方案与周期 | Both |
| 4.2 | Tooling ownership & maintenance模具产权归属与维护约定 | Both |
| 4.3 | Sampling protocol & golden sample sign-off打样验证与量产封样基准 | Both |
| 5.1 | Pre-shipment QC (PSI) & loading大货出厂现场抽检 (PSI) 与装柜监装 | Both |
| 5.2 | Cargo insurance, customs docs & B/L release海运破碎险、清关单证与提单放行 | Both |
| 5.3 | Transit breakage allowance & warranty运输损耗界定与售后保障 | Both |
| 6.1 | Advisory service phases采购顾问服务阶段选择 | Both |
| 6.2 | Payment methods & settlement milestones付款方式与结算节点 | Both |
| 6.3 | Mutual cooperation & action schedule合作保护期与会议推进计划 | Both |
| 6.4 | Complete project cost summary项目全部费用构成总览 | Both · fills itself from the clauses above |
Four statuses, nothing in between.
Every clause carries exactly one status. Cross-linked clauses update each other, so choosing custom tooling in Clause 4.1 also adds its payment milestone to Clause 6.2 and its cost to the summary in Clause 6.4.
- Confirmed
- Both sides agree. The factory works to this.
- TBD
- Filled in, waiting for a check, a quote or a sample before it can be confirmed.
- Pending
- Not yet discussed. The portal lists pending clauses that need your input.
- N/A
- Does not apply to this project, or was declined, with the reason written on the clause.
What you see in the client portal.
Sign in from anywhere. Nothing in the portal depends on a chat history.
- All your orders
- Each order with its number, product, quantity, current stage and how many clauses are confirmed.
- The order route
- The nine stages with dates. The current stage shows what has to be confirmed before it moves on, and whether it is waiting on you or on us.
- The schedule
- Open your order's 24 clauses, fill in your items, and switch between English, Chinese or both.
- Files
- Drawings, photos, spec sheets and reports attached to the order they belong to.
- Export
- Download the schedule in English or Chinese, as JSON, or print it to PDF for signature.